REMEDIAL WORK

8 Parriwi Road

Class 2 residential building

Project Type

Class 2 residential building

location

Mosman NSW 2088

status

design

site area

600 sqm

project overview

This project involves remedial alterations to existing balconies and planter boxes within a Class 2
residential building in Mosman, NSW. The scope
of works includes the demolition of existing
tiles and screed, followed by the installation of
new waterproofing systems compliant with AS
4654.1. The design ensures structural longevity
through the implementation of graded falls (min.
1:80), new grated drains, and overflow provisions, alongside upgraded planter box drainage
systems fully integrated with existing stormwater
infrastructure

Intro

This remedial project addresses the alteration and repair of existing balconies and planter boxes within a Class 2 residential building in Mosman. The scope involves the full demolition of existing tiles and screed layers before the installation of a new waterproofing system compliant with AS 4654.1. The outcome is a structurally sound, fully waterproofed assembly that will perform reliably over the long term.

Discription

The building is a mid-rise residential complex in the established Mosman streetscape, featuring cantilevered balconies with integrated planter boxes that are characteristic of its era of construction. The remedial works focus on the balcony decks and planter drainage systems — areas prone to water ingress over time. The completed works restore the visual and functional quality of these outdoor spaces while ensuring compliance with current waterproofing standards, maintaining the building's prestige appearance without alteration to its external character.

project gallery

Key Features:

Remedial works to balconies and planter boxes

Class 2 building

Waterproofing system compliant with AS 4654.1

Demolition of existing tiles and screed

Graded falls (min. 1:80) and new grated drains

Overflow provisions and upgraded stormwater drainage

Structural longevity and long-term performance outcomes